Platform/Production and survey
Know the shift before it ends.
Ore, waste, and stripping ratio against target, bench by bench, while the shift is still running.

Questions it answers
01
Is Shift B on pace?
02
Which bench is behind, and why?
03
Does the book match the survey?
01
The brief writes itself
One sentence tells you where the shift stands and what is waiting on you.
- Finished, running, and next shift side by side
- What needs you today, most urgent first

02
Every bench against its target
Shovel, dumpers, trips, and volume for each bench. Ahead, on track, or behind.
- Output by grade, with price and royalty
- Trip tonnes checked against surveyed tonnes

03
The daily report, ready to sign
Nine sections, from production to explosives, worked out the same way every day.
- By shift and month to date
- Availability, utilization, and idle hours by reason
- Prints with signature lines

04
Plan and survey on one chain
The yearly plan runs down to today. The monthly survey checks the book.
- Tonnes per day needed to finish the plan
- Book stock against surveyed stock, with a 5% limit

Screens in this module
Today's briefAlertsProduction overviewProduction and benchesDaily production reportSurvey and plan
It works better with these.

See it run on your own shift data.
30 minutes. Bring one problem from your mine.